Installation system Thermo Proof

Add to Wish List
Tox
In stock
Only %1 left
SKU:
ALLV_Installation system Thermo Proof
EAN:
Choose an Option...

Material:  Stainless steel

Thread:  M12

Suitable For:  ETICS, clinker or on flat roofs

€21.47 €17.74

The TOX Thermo Proof is a heavy-duty stand-off installation system for ETICS facades, clinker walls, and flat roofs with insulation thicknesses up to 300 mm. It is designed for quick, secure installation and helps minimize energy loss.

Product isn't available for delivery in your country.

Product description

Installation System Thermo Proof

The TOX Thermo Proof is a heavy-duty stand-off installation system for ETICS facades, clinker walls, and flat roofs with insulation thicknesses up to 300 mm. It is designed for quick, secure installation and helps minimize energy loss.

All steel components are made from A4 stainless steel, helping prevent unattractive rust marks. The infinitely adjustable Iso-Spacer insulation sleeve features a large support surface and SW 24 drive for improved force transfer. The system includes an M12 threaded rod with a length of 400 mm and a static mixer extension for deep drill holes.

Installation:

  • Drill through the thermal insulation

  • Measure the insulation thickness

  • Drill into the building material and remove a layer of plaster if required

  • Clean the drilled hole thoroughly

  • Shorten the threaded rod and Iso-Spacer if required

  • Required rod length: drill-hole depth + insulation thickness + fixture thickness + 20 mm

  • In perforated brick, use a perforated sleeve and insert it fully into the hole

  • Fill approximately two-thirds of the substrate hole with injection mortar, or completely fill the perforated sleeve

  • Insert the threaded rod with the pre-installed Iso-Spacer using a slight rotating movement

  • Screw the Iso-Spacer in until it is positioned just before the plaster surface

  • Allow the injection mortar to cure fully

  • Seal the remaining gap with silicone

  • Install the fixture

Tox